Toilet renovation: at Which to start

The bathroom is an area with specific terms: high humidity, temperature differences. That is why making repairs in the restroom, you need to definitely plan the entire working process, to think about the sequence of measures to be performed. In this guide, you will find out the way to start the repair in the restroom and what kinds of work ought to be performed with your hands. Step-by-step directions for bathroom repair

Stage 1: drawing up a strategy and picking a design solution.

Repair in the bathroom can be of two types:

  • Unplanned, spontaneous, arising from the will of unexpected circumstances. As an instance, in case of an pipe burst, flooding by neighbors.
  • Planned, which is either capital or cosmetic. It requires planning, serious fiscal investment and time.

Begin repairs at the bathroom is to determine the design, interior. Think through the last detail, what’s going to be the space, choose a colour. Pastel colours are conventional, in addition to a combination of blue and blue, black or cherry with beige.

Begin repairs in the toilet is to find out the plan, interior design. Think in detail, what’s going to be the room, pick a color vsyakuhnya.ru. Pastel colours are thought to be traditional, in addition to a combination of colours.

Next point is that the choice of facing substance. Usually, finishing at the toilet is done with vinyl, porcelain tiles, mosaic, plastic panels. Check the pipes, whether it needs to be mended. If necessary, select the right choice. Proceed to the measuring work: step all sides, figure out the area of the area. Based on these data, we mark the location of the plumbing fixtures.

Measure 2: the selection of sanitary fixtures and material for completing.

It is crucial to recognize that the purchase price of sanitary ware simplifies the preparation stage, and not vice versa. This usually means that first we develop a new design project, make a plan, then go to the store. Another thing – you should specify the size of your favorite plumbing fittings and check the plan, whether it fits.

It’s very important to recognize that the cost of plumbing fittings is completed by a preparation phase, and not vice versa. This means that first we develop a new design project, create a plan, and then go to the store. Another one

As for stuff for finishing, it is preferable to get them instantly for the whole repair cycle, and that then you will not be distracted if something has been missing. Remember about preparing the necessary tools.

Step 3: dismantling plumbing and tiling.

After All of the preliminary work is completed, move on to the Start of the work process:

  • Remove the sink and tub from the room, even though they will not be replaced with fresh ones. This manner, you can keep them clean and intact.
  • Eliminate the tile, cleaning following it all of surfaces: ceiling, walls, floor.
  • Remove old paint from the walls, even if they had been previously painted, since the glue alternative or a new layer of paint won’t stick to the surface.

Step 4: Cost of communications: pipes, electrical wiring.

Very often in an older house, you should carefully inspect and replace not only the pipes that are in the bathroom itself, but in addition the principal riser, and at times the interfloor plumbing. What’s it worth doing this? Old pipes anytime may give a leak, then the new fix will be emptied, it is going to require additional investment to get rid of flaws.